Skip to content

Everything a plant runs on, in one system

The order running on the line, the machines that make it, the parts that keep them going, the purchases that refill the shelf and the checks that sign the work off. Mesonify runs all of it on one platform, so nothing has to be retyped between systems.

Layout Cycle time: 12.403xWorking temperature: 70.00Power draw: 35.00RunningWarningFaultGroups

The plant itself

  • Production lines
  • Machines and equipment
  • Tools and moulds
  • Utilities
  • Handling and vehicles

Typical sectors

An hour in the plant

One stop, no paperwork

  1. The line reports itself

    The operation reaches the machine on the terminal, and counts, stops and machine state reach the dispatch list as they happen. When a machine goes down, the operator names the stop and calls maintenance from the same screen, and everyone sees it at once instead of at the end of the shift.

  2. The job gets an owner

    The stop becomes a fault event with the machine and the operation already on it. Maintenance takes the job with a priority and a deadline, and the checklist and the photos it requires travel with it.

  3. The part comes off the shelf

    The technician attaches the spare part from the warehouse. If it is not in stock, the request reaches purchasing on its own.

  4. The order runs its course

    Approval, supplier, auto-numbered order, goods receipt. A late delivery is flagged before anyone asks about it.

  5. The work is proven

    The checklist the job required comes back with its photos and its measurements, and a machine due an electrical-safety revision gets its protocol against the same device record.

  6. The record closes

    Completing the repair ends the stop. Repair time, downtime, parts and cost stay with the device, the lost minutes stay with the work centre and the order they came from, and OEE and MTBF show whether it will happen again.

Use case

Lower your energy costs.

Energy metered per machine, line and building in the same system, so the bill is read where it was run up and a reading out of pattern raises the warning and opens the job.

The same watch covers the machine itself: vibration, temperature or pressure drifting out of pattern opens the work order before the breakdown does.

Layout Power [kW]: 48.20Energy today [kWh]: 612.40Power [kW]: 6.80RunningWarningFault1xIdle power [kW]:12.60Compressor 2Idle power [kW]Last 7 days81216MonTueWedThuFriSatSunNormal range12.6Compressor 2Idle power out of patternHighFaultCreated automatically06:40Check for air leaks

While the line runs

Production reports itself, minute by minute

The chain above starts when something stops. Most of a shift is the other case: the order is running, and the plant needs to know how it is going without anyone walking the floor with a clipboard.

  • What is running, and what is next

    Each operation reaches its work centre with its quantity, its due date and its place in the queue, so the station shows what to make now and the office sees where the order stands.

  • How many, and how good

    Good, scrap and rework are confirmed at the terminal as the shift goes, with the machine's own count offered where it is connected, against the plan rather than against a figure reconstructed the next morning.

  • Why it stopped

    The operator names the stop the moment it happens, or the machine opens it and waits for the reason: changeover, material or breakdown. The minutes add up per work centre, machine and reason instead of becoming "the line was down for a while".

  • What the shift was worth

    OEE per work centre and shift, with availability, performance and quality behind it, and the stop reasons ranked by the time they cost, so the first fix is the one that pays.

Production orders, the dispatch list, the operator terminal and OEE have a page of their own.

Read more about MES

Audited to IATF 16949? The maintenance clause asks for evidence, and this is where it comes from.

Read more about IATF 16949

Modules

Modules are switched on per customer. Start with the ones you need and add the rest when you are ready.

See it running on your own plant.

Ask for a demo on your own production data.