The maintenance evidence an IATF 16949 audit asks for

Clause 8.5.1.5 asks for a documented, planned maintenance system with objectives you measure. Mesonify certifies nobody. What it does is produce the records that show the system runs: the plan, what actually happened, who did it, and what was on the shelf at the time.

What the standard asks of maintenance

  • A documented maintenance system for the equipment that keeps production capable, holding the minimum steps that keep it producing to specification over its working life.
  • Planned preventive maintenance, with predictive methods where they suit the equipment.
  • Periodic overhaul: taking equipment out of service on purpose, on the evidence of its fault and interruption history, before a major unplanned breakdown.
  • Replacement parts available for the equipment production depends on.
  • Maintenance objectives that are documented, measured and reviewed.

What an auditor asks to see

  • The plan, and evidence that the work in it happened on the dates it said.
  • The full history of one machine the auditor points at, without a search through folders.
  • Who did the work, when, what was replaced, and whether the check afterwards passed.
  • The parts held for key equipment, and what happens when a level runs low.
  • The objectives, with the numbers behind them for a period, not an assertion.

Where that evidence comes from

  • The asset and its history

    Devices holds master data, documents, photos and structure down to the component, with every job the machine has ever carried.

    Devices
  • The maintenance plan

    Schedules generate the work ahead of its deadline, inside a tolerance window, planned from the last deadline or from actual completion.

    Schedules
  • Predictive and condition-based work

    Rules watch a tracked value and raise the job when it crosses your limit. Devices with enough recorded failures carry a downtime probability per day.

    Rules
  • Proof the work was done properly

    Events move from new to assigned to completed to checked, with checklists, required photos, the parts used and a printable protocol.

    Events
  • Spare parts for key equipment

    Inventory holds a minimum and a low threshold per part, raises a purchase request on its own below the minimum, and records every movement with quantity and value.

    Inventory
  • The objectives, measured

    Dashboard carries MTBF, MTTR, mean work time, mean idle time, completion against deadline and Pareto over classifications, for any period, device, group or location.

    Dashboard

Clause numbering follows IATF 16949:2016. The standard is a licensed document, so the wording here is our summary of what it asks, checked against the own published FAQ of the IATF rather than quoted. Your copy of the standard is the authority.

See it running on your own plant.

Ask for a demo on your own production data.