Keep the campus safe and the labs running
Lecture theatres, labs and student housing run on systems nobody notices until they stop, and on checks an inspector will ask to see. Give the estates team and the lab managers one register, with the checks planned, the results on record and faults reported by anyone on staff.
What you maintain here
- Building systems
- Lab and research equipment
- Fire safety and emergency lighting
- Lifts
- Electrical installations
- Sports facilities
Typical sectors
One inspection, start to finish
From the due date to the signed protocol
The check raises itself
Ahead of the due date, the schedule creates the fire alarm test for the science block, with its checklist and the photos it has to come back with, and it lands with that building's team.
The results go on record
The technician works through the checklist on a phone and enters the readings the schedule asks for. One detector fails.
The fix is already queued
The failed reading raises a follow-up job on its own, with its priority, its deadline and the checklist for the repair, before the technician has left the building.
The part is approved and ordered
The replacement detector comes off the shelf. If there is none, the request goes to the budget holder for approval and on to the supplier as an order.
The protocol is ready
The repair is checked, the protocol prints from the job, and the detector's history shows the failed test and the fix side by side, with who did what and when.
What changes
Estates and labs on one register
Safety checks on time
Fire alarms, emergency lighting, lifts and electrical installations on schedules that create the job ahead of its deadline and flag it overdue once the tolerance runs out.
See SchedulesResults an inspector can read
Inspections and measurements with pass or fail, an interval and a next due date, a contractor's results imported from a CSV file, and electrical-safety revisions that print as protocols.
See DevicesAnyone on staff can report
A QR code on the door or the instrument and a phone are enough to report a fault with a photo, and the job opens on the right asset in the right building.
See EventsReadings that raise the work
Freezer, incubator and boiler readings from sensors or from routine checks, with a rule that opens the job the moment a value crosses your limit.
See RulesPurchases the budget holder approves
Parts and services go from request to approval to order in one place, with urgency, a deadline and a clear sign of what is waiting on whom.
See Order RequestsEach department sees its own
Groups keep a faculty or a research team to its own equipment and jobs, and the dashboard shows the work and the spend for any building, group and period.
See Dashboard
In the lab
Instruments ready when the experiment is
Research equipment is expensive, shared and booked weeks ahead. When it fails, the repair is the smaller loss.
The instrument's whole file
Manuals, certificates, photos, the manufacturer's service contact, the commissioning date and every job the instrument has had, one QR code away.
Inspected, and provably so
Inspections and measurements with pass or fail, the interval and the next due date, the instrument and calibration certificate they were measured with, and a filter for everything past due.
Warned before the samples are
A freezer or incubator reading from a sensor reaches Mesonify through your gateway, and a rule opens a high-priority job and notifies the roles you choose.
Spares before the service visit
Filters, lamps, seals and the parts the service engineer asks for most, kept in stock with a minimum and booked out against the job they went into.
Modules
Modules are switched on per customer. Start with the ones you need and add the rest when you are ready.
See it on your own campus
Tell us which buildings, labs or checks take most of your week, and we will show you how they would run in Mesonify.