The order reaches the line without a printout
What to run, on which machine, in what order, and how far it has got. The floor works from the same screen the office planned on, and progress comes back without anyone walking over to ask.
The problem
Orders reach the line as paper or a shout, and the office finds out how far the shift got once the shift is over.
How Mesonify carries it
Release it to the floor
The order goes out with its quantity, its due date and the operations of its routing, and the dispatch list shows every work centre's queue: what is running now and what comes after it.
The floor reports progress
Operators confirm good, scrap and rework and name every stop on the terminal at the machine, with the drawing and the checklist on the same screen.
The office sees the same number
Made against ordered, time worked against planned and a finish projected from the real pace, so planning and the floor argue about decisions rather than about numbers. What the order made is booked into stock when it finishes.
Modules
Modules are switched on per customer. Start with the ones you need and add the rest when you are ready.
- Shop-floor visibilityNobody agrees on what happened during the shift, because everyone watched a different part of it.
- Fault reportingFaults reported by shout, note or message get lost, and nobody can say afterwards how long the line actually stood.
- Condition monitoringA reading drifts for weeks in a spreadsheet nobody opens, and a limit set by hand fires either too late or all the time. The first real signal is the stoppage.
See this working on your own plant.
Ask for a demo with your own devices, parts and people.